Announcement: $30 Billion Investment in Mahshahr Petrochemical Zone by the Persian Gulf Petrochemical Brokers Group
موفقیت را به شما نشان میدهیم
میزان پیشرفت
مدت زمان: 360 days
نوع پروژه: Developmental
روش اجرا: EPC
This plan has been designed with the aim of enhancing efficiency and reducing operational costs at the Iranol Petrochemical Complex. Production efficiency will be improved through optimization of chemical processes and upgrading of key equipment. The installation of new catalysts in main reactors will result in a higher conversion rate of raw materials into valuable […]
مشاهده پروژه
میزان پیشرفت
مدت زمان: 280 days
نوع پروژه: Developmental
روش اجرا: EPC
This plan has been designed to enhance efficiency and reduce operational costs at the Iranol Petrochemical Complex. Production efficiency is improved through optimization of chemical processes and upgrading of key equipment. Installing new catalysts in the main reactors leads to an increased conversion rate of raw materials into high-value products. Reconstruction of heat exchangers and […]
مشاهده پروژه
میزان پیشرفت
مدت زمان: 180 days
نوع پروژه: Developmental
روش اجرا: EPC
The optimization of the Northern Power Plant encompasses a series of strategic measures aimed at enhancing the performance and efficiency of the facility. Phase One: Thermal Efficiency and Fuel Optimization The first step involves improving fuel consumption and increasing the plant’s thermal efficiency through the installation of advanced heat recovery systems. These systems reclaim lost […]
مشاهده پروژه
میزان پیشرفت
مدت زمان: 360 days
نوع پروژه: Constructive
روش اجرا: EPS
This plan has been designed with the aim of enhancing efficiency and reducing operational costs at the Iranol Petrochemical Complex. Production efficiency will be improved through optimization of chemical processes and upgrading of key equipment. The installation of new catalysts in main reactors will result in a higher conversion rate of raw materials into valuable […]
مشاهده پروژه